Industrial Access & Power Generation / Double Deck Platen Access System

The Double Deck Platen Access System gives workers a new way to access boiler tube platens safely without suspended scaffolding.

Its unique design also provides workers with the ability to weld from both sides of the platen assembly.

Customized solutions to accommodate alternative deck sizes and configurations can be provided.

  • Fast & easy tool-free assembly: Workers simply clamp the frame assembly onto the rear tubes of the selected platens, attach the decks, flip up the handrail, and then clamp the side rails onto the tube platens.
  • The frame system can be attached in either a high or a low position configuration, depending where access is needed.
  • The system can be used at any height and can be accessed using WINSAFE's Sectional Ladder System, which also clamps onto the boiler tubes.
  • Two systems can be set up and bridged together with scaffold planks to cover a larger span.
  • Lightweight aluminum construction.
  • 750 lbs. weight capacity per deck support.
  • Meets OSHA & ANSI requirements for temporary fixed scaffolding.